13
ASSEMBLY
Zero Clearance with
UK Front
Installation Instructions
• Now reach through the frame and working
from the inside, slacken the two right hand
M8x16mm long screws that hold the slide
bolts in place. Slide the bolt hard behind
the sub-frame, then fully tightenthe two
M8x 16mm long screws. Repeat with the
left hand side. Now carefully tighten the
grub screws in the end of the right and
lefthand slide bolts so that they push
against the inside of the sub-frame, thus
pulling in the UK front and clamping it
onto the sub-frame.
DO NOT OVER-TIGHTEN THE SCREWS.
• Finally return to the screws at the top of
the UK front. First ensure that the UK front
is located correctly and that the UK front
just clears the wall above the fire. Now
fully tighten these two top screws.
. . . continued
Summary of Contents for INTERNATIONAL GAS CONVECTOR BOX
Page 22: ...22 NOTES ...
Page 23: ...23 ...