INSTALLATION MANUAL
ZPS-
K5.3,
K10.3, K20.3 CLAMPING
MODULE WITH SENSOR
MONITORING, MOUNTING FLANGE
877.426.2504
SUBJECT TO TECHNICAL CHANGES.
JERGENS INC. · PHONE: 216.486.5540 · FAX: 216.481.6193 /553720 / 553721/
18
4.2
Installation Instructions
The pull stud with the engagement screw is to be inserted into the
provided hole of the pallet. Please observe the arrangement of the
various nipple shapes and the arrangement of the ZPS timing stud.
Tighten engagement screw with the
torque wrench
and defined torque.
K5: (M6) 16 Nm
K10 : (M8) 34 Nm
K20 : (M12) 120 Nm
4.3 Tolerances and pull stud arrangement
The
pull studs
have the following designs:
Zero-point pull stud (1) - for full centring
T
iming stud (2)
- for centring the remaining free axis
C
learance stud (3)
– exclusively for holding and clamping function