INSTALLATION MANUAL
ZPS-
K5.3,
K10.3, K20.3 CLAMPING
MODULE WITH SENSOR
MONITORING, MOUNTING FLANGE
877.426.2504
SUBJECT TO TECHNICAL CHANGES.
JERGENS INC. · PHONE: 216.486.5540 · FAX: 216.481.6193 /553720 / 553721/
22
6.4
Monthly maintenance
•
Visual inspection of the condition of the ZPS
•
Checking the mounting screws and engagement
screws for firm seating
•
Removal of deposits on the module surface
•
Check for integrity and functioning of the system
•
Check of the pressure hoses or tubing
•
Check the oil level, change oil if needed
6.5
Maintenance
Annual maintenance, but at least according to the following cycles:
Size
Clamping cycles
K10.3
4,000,000
K20.3
4,000,000
Dismantling of the ZPS and renovation of the O-rings and the spring stack
Exchanging both elements is recommended as preventive repair.
Preventive repair should be done at shorter intervals in case of very
frequent clamping processes. The procedure for this should be
coordinated with JERGENS INC.
K
5
.3
4,000,000