www.javad.com
JNSGyro-4T Operator’s Manual
2-5
C O N F I G U R A T I O N
Connecting the JNSGyro-4T and a Computer
flow control (if applicable) – display in the lower-left corner of the main
window of PCView. A timer begins to count up in the lower-right corner as
well (Figure 2-4).
Figure 2-4. PCView Connection Established
Summary of Contents for JNSGyro-4T
Page 2: ......
Page 8: ...vi JNSGyro 4T Operator s Manual www javad com Notes ...
Page 12: ...x JNSGyro 4T Operator s Manual www javad com Notes ...
Page 48: ...2 18 JNSGyro 4T Operator s Manual www javad com Notes ...
Page 58: ...3 10 JNSGyro 4T Operator s Manual www javad com Notes ...
Page 102: ...A 12 JNSGyro 4T Operator s Manual www javad com Notes ...
Page 112: ...B 10 JNSGyro 4T Operator s Manual www javad com Notes ...
Page 116: ...D 2 JNSGyro 4T Operator s Manual www javad com Notes D ...