
16
07610-003-61-42-U
For the first operation of each day, it might be necessary to run the machine through
three cycles to ensure that all of the cold water is out of the system and to verify that
the unit is operating correctly. To cycle the machine, ensure that the power is on
and that the tub has filled to the correct level. Lift the doors and the cycle light will
illuminate. When the light goes out, close the doors, the unit will start, run through the
cycle, and shut-off automatically. Repeat this two more times. The unit should now be
ready to proceed with the washing of ware.
To wash a rack, open the doors completely (avoiding hot water that might drip from
the door) and slide the rack into the unit.
Close the door and the unit will start automatically. Once the cycle is complete,
open the door (again watching for the dripping hot water) and remove the rack of
clean ware. Replace with a rack of soiled ware and close the door. The process will
repeat itself.
Based upon usage, the scrap screen may become clogged with soil and debris as
the workday progresses. Operators should regularly inspect the scrap screen to
ensure it has not become clogged. If clogged, it will reduce the washing capability of
the machine. Instruct operators to clean-out the scrap screen at regular intervals or
as required by workload.
1.
Turn machine off by flipping the “Power On/Power Off” switch to “OFF.”
2. Open the door and allow steam/heat to escape.
3. Remove the standpipe and allow tub to drain.
WARNING: Wash tank water will be hot!
WARM-UP CYCLES
WASHING A RACK
OF WARE
OPERATIONAL
INSPECTION
SHUTDOWN &
CLEANING
!
WARNING
OPERATING INSTRUCTIONS
OPERATION
Summary of Contents for TEMPSTAR LT
Page 35: ...07610 003 61 42 U 28 26 1 29 28 30 33 34 36 CONTROL BOX ASSEMBLY PARTS ...
Page 67: ...07610 003 61 42 U 60 PARTS VENTLESS SYSTEM ASSEMBLY ...
Page 75: ...07610 003 61 42 U 68 SCHEMATICS 208 230 V 50 60 HZ 1 PHASE ...
Page 76: ...69 07610 003 61 42 U SCHEMATICS 460 V 50 60 HZ 3 PHASE ...
Page 77: ...07610 003 61 42 U 70 SCHEMATICS LT NB 208 230 V 50 60 HZ 1 PHASE ...
Page 78: ...71 07610 003 61 42 U SCHEMATICS LT NB 460 V 50 60 HZ 3 PHASE ...
Page 79: ...07610 003 61 42 U 72 SCHEMATICS STEAM 208 230 V 50 60 HZ 1 3 PHASE ...
Page 80: ...73 07610 003 61 42 U SCHEMATICS SDI OPTIONS ...
Page 81: ...07610 003 61 42 U 74 SCHEMATICS DRAIN QUENCH OPTION ...