The convector is furnished and preset for the gas
function (G 20) and regulated in factory.
Note: the apparatus can also be requested with the
GPL gas function.
First things to do before you start the convector
check:
- If the convector is preset for the right gas
- The gas connection is correctly realized and the
gas switch is opened.
- The electrical connections are properly done.
Remember it is also important to realize a good
ground connection and to respect the neutral
phase.
During the first starting, you might verify vapour
and irritating smells not dangerous. To avoid
these discomfort we advice to aerate the place.
- See if the gas switch is turned on.
- Check if the wall switch is positioned (on).
- See if the electric extension is inserted in the
socket and the plug is inserted under the convector.
- Adjust the atmospheric thermostat at number 7 for
a fast heating or as you prefer.
- Position the Timer to manual.
- After completing the above operations, turn on the
main power switch to start the convector.
The convector is going to start the phase, and it is
going to stop when it has reached the atmospheric
temperature (It turns off the function single on the
control panel).
If there are going to be any problems, the convector
is going to affect a “ stop of block”, and it's going to
illuminate the trigger release button. To restart the
convector, push the trigger release button after you
wait to see if the convector starts this function.
This operation can be repeated only 2 or 3 times.
If the convector doesn't start after three attempts,
place the main button to “off” and call Technical
Service Assistance or the Manufacturer.
When the convector is working you can program the
hours you want it to stay turned on.
To active t this function you have to put the selector
on the “Automatic Timer”.
1
2
3
4
5
6
7
16
17
18
19
20
2
1
2
2
2
3
24
1
2
3
4
5
6
7
8
9
10
1
1
12
13
14
15
16
17
18
19
20
2
1
2
2
2
3
24
1
2
3
4
5
6
7
8
9
10
1
1
12
13
14
15
1
2
3
4
5
6
7
16
17
18
19
20
2
1
2
2
2
3
24
1
2
3
4
5
6
7
8
9
10
1
1
12
13
14
15
16
17
18
19
20
2
1
2
2
2
3
24
1
2
3
4
5
6
7
8
9
10
1
1
12
13
14
15
1
2
3
4
5
6
7
16
17
18
19
20
2
1
2
2
2
3
24
1
2
3
4
5
6
7
8
9
10
1
1
12
13
14
15
16
17
18
19
20
2
1
2
2
2
3
24
1
2
3
4
5
6
7
8
9
10
1
1
12
13
14
15
PRELIMINARY OPERATIONS
25
CUSTOMER SERVICE
FIRST SERVICE START
Summary of Contents for Poster PE t1 30
Page 1: ......
Page 37: ...37 NOTE NOTE ...
Page 38: ...38 NOTE NOTE ...
Page 39: ......
Page 40: ...35200097 Rev 1 10 2006 ...
Page 41: ......
Page 47: ...user 7 CONVECTOR POSTER Fox PE GAS CONVECTOR TYPE C FOR HEATING ...
Page 56: ...user 35200097 Rev 1 10 2006 ...