TM3215,3245,3265
50
FIG. 5-31:
Linkage provides two positions of connecting
the top link (1) to the tractor.
For most implements, securing the top link (1) in the up-
per hole A is satisfactory, but position may be varied to
provide increased implement height during transport.
CAUTION: Secure all pins after adjustment
is made. Always use pins supplied with the
tractor.
When top link is not used, fix top link by top link hook.
CAUTION: Hook on the screw parts of top
link and never interfere with lift rod.
When top link is used, hold the top link hook by clamp
on frame.
1
FIG. 5-31
FIG. 5-32
FIG. 5-33