4. Equipment required for installation 

1. Welding 

equipment 

2. 

Pressure (hot-tap) drilling machine; 

 

Mueller type DH-5 or equivalent. 

3. 

1 1/16"drill bit Mueller 33530 

4. 

Drill holder Muelller 33555 

5. 

Adapter nipple Mueller 36195 

 
(Items 2 through 5 are available from Mueller Co., 
Decatur, Illinois. In most cases, the public service 
company in your city is available to do the "hot-
tapping" job, or the equipment may be rented or 
purchased locally.) 
 

 
 

Pressure drill machine and tooling: 

 
 

 

 

5. General Installation Notes 

In order to obtain optimal measurement results, 
follow the notes concerning the installation of the 
ITABAR Sensor given below. 
 

5.1 Determination of Pipe Arrangement 

For design reasons, the pipe arrangement at the 
installation location has to be known before the 
sensor is manufactured.  
For horizontal pipe arrangements the instrument 
connections are placed in-line with the flow 
direction (see Figure 2). 
For vertical pipe arrangements, the instrument 
connections for the measurement of the differential 
pressure are arranged at an angle of 90° to the flow 
direction (see Figure 3). 
 

 

Ratchet handle

Collar

Locking mechanism

Feed tube and yoke

Clean-out notch

Oil hole

Bleeder valve

Machine adapter nipple

Cutter arbor

Shell cutter

Pilot drill

Fig. 2:  Placement of the differential pressure 

connecting studs for horizontal pipe 
arrangement 

 
 

 

Fig. 3:  Placement of the differential pressure con-

necting studs for vertical pipe arrangement 

 

 

The flow direction is indicated in each case by an 
arrow on the sensor head. 

Summary of Contents for Analog Node

Page 1: ...Installation of the ITABAR Sensor 6 6 1 Installation of Type FTMD25 6 6 2 Installation of Type FTMD26 7 6 3 Insertion Procedure for FTMD 8 6 4 Retract Procedure for FTMD 8 7 Installation of the Attach...

Page 2: ...ept for drilling and welding equipment These instructions call for the use of a Mueller DH 5 drilling machine or equivalent which is rated for 80 bar at 35 C with a maximum temp erature of 120 C This...

Page 3: ...1 Determination of Pipe Arrangement For design reasons the pipe arrangement at the installation location has to be known before the sensor is manufactured For horizontal pipe arrangements the instrume...

Page 4: ...flow measurements in a horizontal pipe the ITABAR Sensor must be installed in the lower half of the pipe circumference the connections to the instruments have to be located below the pipe axis Fig 5...

Page 5: ...eous installation location As a general rule regulating valves throttle valves and gate type valves should be installed behind the sensor Note If the recommended straight pipe run lengths are not avai...

Page 6: ...l flanged nipple 8 Drill through the pipe wall in accordance with the instructions supplied with the drilling machine For type FTMD 25 35mm 9 Withdraw the drill past the Flo Tap unit isolating valve C...

Page 7: ...one end around the installed weld socket 4 Wrap the other end of the cord around the pipe so that it forms a loop around the pipe Mark the half way point of the pipe circumference on the pipe 5 Now dr...

Page 8: ...h temperature gland additional adjustment may be required at this time 8 6 10 3 4 Fig 13 retracted Flo Tap Sensor 5 Connect instrument lines to the instrument valves and to the appropriate meter recor...

Page 9: ...followed by a zero point error We recommend you to install the differential pressure lines close together connect hi and lo line heat conducting to maintain equal temperature Attention The differenti...

Page 10: ...ng signal The ITABAR sensors are head measuring devices and will not accurately measure two phase flow ITABAR Flow Sensors for low pressure steam have condensate pots in which the condensate water lin...