ITABAR Flow Sensor Type 

FTMD 

Operating manual

 

 
 

4.  After the probe is fully retracted, the Flo-Tap 

unit isolating valve {2} may closed for 
complete disassembly. 

 

7. Insulation 

It is important for proper operation of the ITABAR 
steam sensor that the phase change from vapour to 
liquid take place only in the therefore specially 
designed condensation vessels and not in the head 
of the sensor. 

Attention! 

Do not insulate the condensation vessels. 
The media in the differential pressure lines and 
transmitter must be in a liquid state. 
 

8. 

Installation  of  valve  block  and          

 

p-transmitter                 

8.1. Valve 

block 

For steam measurement a 3-valve instrument 
manifold is recommended. The valves of a 3-valves 
manifold have the following functions: 

•  Valve C and D shutt-off to transmitter, 
•  Valve E Bypass valve (transmitter zero), 
 
If a 5-vlave instrument manifold be used the value 
has additiona function: 

  value F and G for drains 

 
See Fig. 11 
 

8.2. 

p-Transmitter: 

For steam measurements, the differential pressure 
transmitter should always be installed below the 
ITABAR sensor in order to avoid the occurrence of 
air bubbles in the instrument connections (see Fig. 
11). Take care to mount the dp-transmitter exactly 
horizontal, otherwise a small difference to 
alignment is followed by a zero point error. 
We recommend you to install the differential 
pressure lines close together (connect hi and lo line 
heat conducting) to maintain equal temperature. 

 

Attention!

 

The differential pressure lines must have a min. inside 
diameter from 10mm. Because the max. drop diameter 
from water is 6,5mm. 
(Prandl, L. "Führer durch Strömungslehre") 
 

 

 

 

 

Fig. 11 

 

9. Measurement 

Start-Up 

Make sure that: 
-  all installation openings are closed, 
-  all installed parts are securely bolted together, 
-  all shut-off valves are closed, 
-  close valve A and B for 15 minutes, so that 
 

water can constitute in the condensate pots. 

-  all valves of 3- or 5-way manifold are closed. 
-  open valves A and B, after then all valves at the 
 3-way 

manifold. 

  Attention: If a 5-way manifold valve are 
mounted 
  valves F and G must be closed, because after 
the 
 

condensate steam penetrate and this can be  

 

daugerous for personal. 

-  After 5 minutes, water will be constitute from 
 

the lowest point to the condensate pots. 

-  close valves A and B and open vent valves C 

and   D, so air bubbles can escape. 

-  close valves C and D again, the transmitter must 
 

show an 4 mA signal. By using a transmitter 

 

with 0-20 mA output, it must be 0 mA. 

-  If the output signal from the transmitter is 
 

more then 0 or 4 mA, the condensate pots don`t 

 

have the same level. 

-  By difference, the transmitter must adjust to 0 
 

or 4 mA. 

-  close valve E of the 3- or 5-way manifold. After 
  open valves A and B, the measuring are in 
 operation. 
 

Summary of Contents for Analog Node

Page 1: ...Installation of the ITABAR Sensor 6 6 1 Installation of Type FTMD25 6 6 2 Installation of Type FTMD26 7 6 3 Insertion Procedure for FTMD 8 6 4 Retract Procedure for FTMD 8 7 Installation of the Attach...

Page 2: ...ept for drilling and welding equipment These instructions call for the use of a Mueller DH 5 drilling machine or equivalent which is rated for 80 bar at 35 C with a maximum temp erature of 120 C This...

Page 3: ...1 Determination of Pipe Arrangement For design reasons the pipe arrangement at the installation location has to be known before the sensor is manufactured For horizontal pipe arrangements the instrume...

Page 4: ...flow measurements in a horizontal pipe the ITABAR Sensor must be installed in the lower half of the pipe circumference the connections to the instruments have to be located below the pipe axis Fig 5...

Page 5: ...eous installation location As a general rule regulating valves throttle valves and gate type valves should be installed behind the sensor Note If the recommended straight pipe run lengths are not avai...

Page 6: ...l flanged nipple 8 Drill through the pipe wall in accordance with the instructions supplied with the drilling machine For type FTMD 25 35mm 9 Withdraw the drill past the Flo Tap unit isolating valve C...

Page 7: ...one end around the installed weld socket 4 Wrap the other end of the cord around the pipe so that it forms a loop around the pipe Mark the half way point of the pipe circumference on the pipe 5 Now dr...

Page 8: ...h temperature gland additional adjustment may be required at this time 8 6 10 3 4 Fig 13 retracted Flo Tap Sensor 5 Connect instrument lines to the instrument valves and to the appropriate meter recor...

Page 9: ...followed by a zero point error We recommend you to install the differential pressure lines close together connect hi and lo line heat conducting to maintain equal temperature Attention The differenti...

Page 10: ...ng signal The ITABAR sensors are head measuring devices and will not accurately measure two phase flow ITABAR Flow Sensors for low pressure steam have condensate pots in which the condensate water lin...