Intel® Server D50TNP Family Integration and Service Guide
47
Figure 39. Installing Front VR Blocks
2.
Align the front VR cooling blocks to the screw holes following the orientation shown (see Letter A).
3.
Using the fastener screws, secure the front VR cooling blocks to the server board (see Letter B). Tighten
to 3 in-lb.
Figure 40. Assembling the Manual Applicator
4.
Assemble the Bergquist SS95407 applicator, Bergquist GF3500S35 thermal gap filler cartridge, and
Bergquist SS95437 nozzle as shown in the figure above.