5.
Insert the data cable into the jack located at the back of the OnTime Clock.
6.
Position the keyhole slots located on the rear of the clock over the fastener
heads.
7.
Pull the clock slightly downward until the unit is seated securely.
The following is a recommended procedure for pendant mounting. This
procedure requires a mounting kit (either ONT4KIT or ONT6KIT) and some
additional hardware.
Figure 8: Digital Clock Pendant Mounting
1.
Determine the clock mounting location.
Note: The illustration above suggests a recommended mounting means for a
pendant mount of one or more OnTime Clocks.
Supplement the mounting kit
with two suitable locknuts and a length of ¾” (1.9 cm) pipe or conduit.
2.
Mark the location where the clock assembly is to be mounted, making
sure that the mounting means is located beneath the data cable outlet.
3.
Assemble and tighten the locknuts and pipe length as shown above.
4.
Insert about 10 to 12 inches (30 cm) of data cable through the center hole
of the mounting kit. Securely attach the mounting means, using fasteners
suitable for the surface.
5.
Lift an OnTime Clock into position and insert the data cable into the jack
located on the back of the clock.
6.
Position the keyhole slots located on the rear of the clock over the
mounting tabs.
7.
Pull the clock slightly downwards until the unit is seated.
8.
Repeat for the second clock if two clocks are being installed back-to-back.
Summary of Contents for OnTime 4-Digit Digital Clocks
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 21: ...Figure 15 Power Up Sequence...