86
AC-SVX002C-EN
Ascend
™
™
Model ACS
Installation Completion Check
Sheet and Request for Trane
Service
IIm
mp
po
orrtta
an
ntt:: A copy of this completed form must be
submitted to the Trane service agency that
will be responsible for the start-up of the
chiller. Start-up will NOT proceed unless
applicable items listed in this form have
been satisfactorily completed.
To:
Trane Service Office:
S.O. Number:
Serial Numbers:
Job/Project Name:
Address:
The following items
are being installed
and will be completed by:
IIm
mp
po
orrtta
an
ntt:: Start-up must be performed by Trane or an
agent of Trane specifically authorized to
perform start-up and warranty of Trane®
products. Contractor shall provide Trane
(or an agent of Trane specifically
authorized to perform start-up) with notice
of the scheduled start-up at least two weeks
prior to the scheduled start-up.
IIm
mp
po
orrtta
an
ntt:: IItt iiss rre
eq
qu
uiirre
ed
d tth
ha
att h
he
ea
atte
errss a
arre
e e
en
ne
errg
giizze
ed
d
ffo
orr a
a m
miin
niim
mu
um
m o
off 2
24
4 h
ho
ou
urrss p
prriio
orr tto
o sstta
arrtt
u
up
p.. T
Th
he
erre
effo
orre
e,, cch
hiilllle
err ssh
ho
ou
ulld
d h
ha
av
ve
e p
po
ow
we
err
ffo
orr tth
hiiss a
am
mo
ou
un
ntt o
off ttiim
me
e b
be
effo
orre
e T
Trra
an
ne
e
S
Se
errv
viicce
e a
arrrriiv
ve
ess tto
o d
do
o sstta
arrtt--u
up
p..
Check boxes if the task is complete or if the answer is
“yes”.
1. C
Ch
hiilllle
err
☐
Installation meets foundation requirements
☐
In place and piped.
☐
Isolation pads or elastomeric isolators installed.
☐
Chiller is level to within 1/4" end-to-end and
side-to-side.
☐
Record and report any damage to the chiller.
2. P
Piip
piin
ng
g
☐
Water piping flushed before making final
connections to the system
☐
Chilled water piping connected to:
☐
Evaporator
☐
Air handling units
☐
Pumps (no piping to pump required if
optional pump package is installed)
☐
Strainer installed and cleaned at entering water
connection
N
No
otte
e:: Do NOT remove strainer mesh to clean
the system.
☐
Verify chilled water inlet vents and chilled water
outlet drains are closed or plugs installed
☐
Water supply connected to filling system
☐
Does unit have freeze inhibitor? If unit has
freeze inhibitor:
☐
Verify type and concentration correct per
unit submittal
☐
Calculate and record freeze point of the
solution: __________
☐
Systems filled
☐
Pumps run, air bled from system
☐
Relief valve ventilation piping installed (if
applicable)
☐
Flow balancing valves installed on leaving
chilled water
☐
Gauges, thermometers, and air vents installed
on both sides of evaporator
3. W
Wiirriin
ng
g
☐
Wire size per submittal and NEC 310-16
☐
Unit is properly grounded
☐
All wiring connections are tight (not limited to
field wiring - include factory wiring and
connections)
☐
Full power available, and within utilization
range
☐
Interconnecting wiring to control panel (as
required)
☐
Chilled water pump connected and tested (not
required if optional pump package is installed)
☐
Heat recovery condenser water pump (as
applicable)
☐
115 Vac power available for service tools
☐
All controls installed and connected
4. T
Te
essttiin
ng
g
☐
Trace gas amounts of R-410A available for leak
testing, if necessary