60
AC-SVX002C-EN
Pre-Start
Upon completion of installation, complete the
Installation Completion Check Sheet and Request for
Trane Service checklist in Log and Check Sheet
chapter.
IIm
mp
po
orrtta
an
ntt:: Start-up must be performed by Trane or an
agent of Trane specifically authorized to
perform start-up and warranty of Trane
products. Contractor shall provide Trane
(or an agent of Trane specifically
authorized to perform start-up) with notice
of the scheduled start-up at least two weeks
prior to the scheduled start-up.