AC-SVX002C-EN
13
Installation Requirements
Type
Trane Supplied
Trane Installed
Trane Supplied
Field Installed
Field Supplied
Field Installed
Foundation
• Meet foundation requirements
Rigging
• Safety chains
• Clevis connectors
• Lifting beam
Isolation
Elastomeric isolators
(optional)
• Elastomeric isolators (optional)
Electrical
• Circuit breakers (optional)
• Unit Mounted Starter
• Circuit breakers (optional)
• Electrical connections to unit mounted starter
• Wiring sizes per submittal and NEC
• Terminal lugs
• Ground connection(s)
• BAS wiring (optional)
• Control voltage wiring
• Chilled water pump contactor and wiring including
interlock
• Option relays and wiring
Water piping
• Flow switch
• Water strainer
• Taps for thermometers and gauges
• Thermometers
• Water flow pressure gauges
• Isolation and balancing valves in water piping
• Vents and drain
• Waterside pressure relief valves
Insulation
• Insulation
• High humidity insulation (opt)
• Insulation
Water Piping Connection
Components
Grooved pipe
Other Materials
• R-410A refrigerant
(1 lb max per unit as needed)
• Dry nitrogen
(20 psig max per unit as needed)
Ascend™ Model ACS
Installation Completion Check
Sheet and Request for Trane
Service
(AC-ADF003*-EN)
See Log and Check Sheet
chapter
Chiller Start-up
Commissioning
Trane, or an agent of Trane
specifically authorized to perform
start-up of Trane® products