EonStor / EonStor DS S12/S16/S24 Series
4.
Loosen the screw
that secures the control module’s ejection levers.
5.
Push the ejection levers downwards (indicated by the
blue arrows
).
The
.
controller module will automatically ease out of the controller module bay
6.
Insert the new controller module
. Carefully push the controller until you feel
the contact resistance when the board edge connectors are engaging the
backplane. Push the ejection levers upward (indicated by the
blue arrows
) and
fasten the retention screw on the ejection levers.
7. Reattach all the cables.
8.
For single controller models or when replacing both controllers
on the LCD
screen, SANWatch, or firmware menu-driven utility. When the replacement
controller is successfully brought online, the
Power On Status LEDs
simultaneously, power up the system
.
Check system message
should turn
on properly.
.
For single controller models or replacing both controllers simultaneously
,
9
145