17
17
Important
—the “All Solenoids use Stage1 Nitrous pulse frequency.” op on must be un
‐
checked (o
ff
) and the “Stage1 Ni
‐
trous and Fuel Solenoids independent frequency.” must be selected for the feature to enabled. When this feature is ena
‐
ble the fuel solenoid frequency (hertz) can be adjusted independently of the nitrous frequency (hertz).
The solenoid pulse frequency (or also known as Hertz) is how many mes the solenoids open and close when not at 0 or 100 percent
opera on. Example
‐
pulse frequency set to 10 hertz and 50 percent, the solenoids would open and close 10 mes per second. Total
me for each pulse = 1 / 10 = .1 second, total me solenoid would be on = .1 * .50% = .05 second.
Resume Start Percent
‐
This se ng determines the percent the Stage2 Nitrous resumes at if the user has to li the thro le during Ac
‐
va on. This se ng is only valid if the Hold And Wait op on is ON. This se ng is used with the Resume Percent per Pulse se ng to
build a Resume Ramp. If the Resume Start Percent is greater than the current output percent the Resume Ramp is ignored.
Valid range
‐
10% to 100% in .1% increments. A se ng of 100% disables this feature.
Resume Percent per Pulse
‐
This se ng determines the rate at which the Nitrous Resumes if the user li s the thro le during Ac va
‐
on. This se ng is used with the Resume Start Percent to build a Resume Ramp. This allows the user to adjust how quick the nitrous
comes back on if the Ac va on signal is removed.
Example
‐
10% per pulse would increase the rate 10% for each pulse star ng at the Resume Start Percent se ng. 35% Resume and
then each pulse of the solenoid would increment 10% un l the se ng in the ramp is is achieved. A er the resume ramp is completed
the normal build me ramp is followed.
Valid range
‐
10% to 50% in .1% increments.
Quick Ramp Builder
‐
Use this selec on to do Quick Progressive setups. This feature allows the nitrous to be setup using a Start Per
‐
centage, Final Percentage, and a Build Time.
Start Percentage
‐
This se ng determines the ramp Star ng Percentage. The Start Percent can be less than or greater than the Final
Percent se ng. If the Start Percent is greater than the Final Percent the ramp will progress backwards.
Valid range
‐
0% to 100% in .1% increments.
Final Percent
‐
This se ng determines the ramp Final Percentage. The Final Percent can be less than or greater than the Start Percent
se ng. If the Start Percent is greater than the Final Percent the ramp will progress backwards.
Valid range
‐
0% to 100% in .1% increments.
Build Time
‐
This se ng determines the me it takes for the nitrous to ramp from the Start Percent to the Final Percent se ngs. A
short Build Time will make the nitrous ramp more aggressive and a longer Build Time will make it less aggressive.
Valid range
‐
.200 to 9.900 seconds in .1 second increments.