14
14
Important
—the “All Solenoids use Stage1 Nitrous pulse frequency.” op on must be un
‐
checked (o
ff
) When this feature is
enable the Stage2 solenoid frequency (hertz) can be adjusted independently of the Stage1 frequency (hertz).
The solenoid pulse frequency (or also known as Hertz) is how many mes the solenoids open and close when not at 0 or 100 percent
opera on. Example
‐
pulse frequency set to 10 hertz and 50 percent, the solenoids would open and close 10 mes per second. Total
me for each pulse = 1 / 10 = .1 second, total me solenoid would be on = .1 * .50% = .05 second.
Resume Start Percent
‐
This se ng determines the percent the Stage1 Fuel resumes at if the user has to li the thro le during Ac va
‐
on. This se ng is only valid if the Hold And Wait op on is ON. This se ng is used with the Resume Percent per Pulse se ng to build
a Resume Ramp. If the Resume Start Percent is greater than the current output percent the Resume Ramp is ignored.
Valid range
‐
10% to 100% in .1% increments. A se ng of 100% disables this feature.
Resume Percent per Pulse
‐
This se ng determines the rate at which the Fuel Resumes if the user li s the thro le during Ac va on.
This se ng is used with the Resume Start Percent to build a Resume Ramp. This allows the user to adjust how quick the fuel comes
back on if the Ac va on signal is removed.
Example
‐
10% per pulse would increase the rate 10% for each pulse star ng at the Resume Start Percent se ng. 35% Resume and
then each pulse of the solenoid would increment 10% un l the se ng in the ramp is is achieved. A er the resume ramp is completed
the normal build me ramp is followed.
Valid range
‐
10% to 50% in .1% increments.
Quick Ramp Builder
‐
Use this selec on to do quick progressive setups. This feature allows the fuel to be setup using a Start Percent
‐
age, Final Percentage, and a Build Time.
Start Percentage
‐
This se ng determines the ramp Star ng Percentage. The Start Percent can be less than or greater than the Final
Percent se ng. If the Start Percent is greater than the Final Percent the ramp will progress backwards.
Valid range
‐
0% to 100% in .1% increments.
Final Percent
‐
This se ng determines the ramp Final Percentage. The Final Percent can be less than or greater than the Start Percent
se ng. If the Start Percent is greater than the Final Percent the ramp will progress backwards.
Valid range
‐
0% to 100% in .1% increments.
Build Time
‐
This se ng determines the me it takes for the fuel to ramp from the Start Percent to the Final Percent se ngs. A short
Build Time will make the fuel ramp more aggressive and a longer Build Time will make it less aggressive.
Valid range
‐
.200 to 9.900 seconds in .1 second increments.