21
Response SE Combi -
Installation
INSTALLATION
25 WATER CONNECTIONS
DHW CONNECTIONS
CH CONNECTIONS
For top connections:
Use straight pipe and elbow (not supplied)
For top connections:
Reverse 15mm pipe
Note.
Do not subject any of the isolating valves to heat as the seals may be damaged.
Extend a gas supply pipe of not less than 22mm O.D.
copper or 3/4" BSP iron to the boiler.
A working gas pressure of 20mbr (8" w.g) must be
available at the boiler inlet, with the boiler firing at full
DHW output.
Bottom and top connections
1.
Solder the 1/2" connector, street elbow, straight pipe and
reducing coupling together.
2.
Remove the gas cock bracket complete with gas cock.
3.
Screw the connector into the gas cock in the correct orientation.
4.
Screw the complete assembly back onto the mounting frame.
26 GAS CONNECTION
SIDE FLUE OUTLET