27
Response SE Combi -
Installation
37 FILLING - Central Heating
1.
Ensure that the CH isolating valves are open.
2.
Release the securing screw and swing the control panel
down.
3.
Fill and vent the system. Check for water soundness.
Refer also to Frame 4
INSTALLATION
Front elevation layout of boiler components (control panel open)
Legend
A
Boiler heat exchanger
B
Gas valve
C
Safety valve
D
DHW plate heat exchanger
E
Condensate & safety drains
F
CH flow
G
DHW out
H
Gas inlet
I
DHW adjuster
J
DHW in
K
CH drain
L
CH return
M
Diverter valve
N
Pump
O
CH expansion vessel
P
Automatic air vent
Q
Flue sensing point
Diverter valve shown in
CH position.
Forward position
indicates DHW.
INST
ALLA
TION