17
Response SE Combi -
Installation
INSTALLATION
2.
Undo the 2 screws and remove the
boiler bottom panel.
3.
Lift the boiler on to the wall, locating
the CH flow and return pipes, DHW
inlet and outlet pipes and gas pipe to
the service pipes.
Tighten all pipe connections.
17 MOUNTING THE BOILER
1.
Remove the boiler casing:
a.
Undo the securing screw.
b.
Disengage the casing from the back panel and lift it
from the boiler.
18 CUTTING THE FLUE
Rear Flue Length of 114 to 580mm
Note.
If the optional standoff bracket kit is
used it is essential that 80 mm is
added to the measured wall thickness
when marking the flue (to allow for the
thickness of the brackets).
1.
Measure and note wall thickness X.
2.
Add 40mm (1
5/8
") to dimension X and,
measuring from the groove, cut the tube.
IMPORTANT
Measure from the groove marked 'TOP'
not
the larger groove.
3.
To ensure the tube is cut square, mark the
flue all the way round.
4.
Cut to length, using the cardboard support
aid.
5.
Remove the cardboard support and any
burrs.
REAR FLUE OUTLET