Harvest Sequence
5. Harvest
With the water pump de-energized, the hot gas valve and
HPR solenoid valves are energized. The refrigerant gas
warms the evaporator causing the cubes to slide, as a
sheet, off the evaporator and into the storage bin.
The sliding sheet of cubes opens the water curtain and bin
switch.
The momentary opening and re-closing of the bin switch
terminates the harvest sequence and returns the ice
machine to the freeze sequence (Step 4).
6. Water Purge/Fill
Once ice drops, the hot gas valve & HPR solenoid close
and the dump valve, water inlet valve, and water pump
are energized. The dump valve closes after approximately
10 seconds while the water inlet valve and water pump
remain energized. The water inlet valve closes once water
reaches the high-level probe on the water level sensor.
5
9
Summary of Contents for IM Series
Page 1: ...Revision Date 1 24 22 IM Series Air Water Remote Ice Machines Technician s Handbook ...
Page 2: ......
Page 3: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 9: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 15: ...THIS PAGE INTENTIONALLY LEFT BLANK 14 ...
Page 17: ...How to Read a Serial Number Full Serial Number 16 ...
Page 35: ...THIS PAGE INTENTIONALL Y LEFT BLANK 34 ...
Page 48: ...Flexible Numeric Display FND Functions 47 ...
Page 93: ...THIS PAGE INTENTIONALLY LEFT BLANK 92 ...
Page 106: ...Testing the water level sensor Before S N Starting With VC 105 ...
Page 134: ...SERVICE REMOTE RECOVERY EVACUATION CONNECTIONS 133 ...
Page 145: ...THIS PAGE INTENTIONALLY LEFT BLANK 144 ...
Page 155: ...THIS PAGE INTENTIONALLY LEFT BLANK 154 ...
Page 157: ...Wiring Diagram 156 ...
Page 158: ...PCB Layout 157 ...
Page 159: ...PCB Dip Switches 158 ...
Page 161: ...SPACE FOR TECHNICIAN S NOTES ...
Page 162: ...SPACE FOR TECHNICIAN S NOTES ...
Page 163: ...SPACE FOR TECHNICIAN S NOTES ...
Page 164: ...SPACE FOR TECHNICIAN S NOTES ...
Page 165: ......