ELEVATION SERIES CIM CUBER
PURGE VALVE
44
Purge Valve
Operation
The Purge Valve is located in the back of the
Evaporator. The Valve should open when
energized by Relay 5 on the Board (LED ON)
during the Harvest Cycle to help empty the
mineral laden water (see Sequence of Opera‐
tion pg. 9) and during the Cleaning/Sanitizing
Cycle (see Cleaning Instructions pg. 56).
Troubleshooting
The Purge Valve is located in the back of the Evaporator. The Valve should open when energized
by Relay 5 on the Board (LED ON) during the Harvest Cycle to help empty the mineral laden
water and during the Cleaning/Sanitizing Cycle. If Purge Valve fails to open with Relay 5 LED illu‐
minated, unplug Connector at coil of Valve and check for line voltage. If none is found, check
output voltage at Molex at Board between Pink and Blue wires. If no voltage is found, the Board
is the issue. If output voltage is found, wiring between Molex and connector at Valve is the issue.
Voltage can also be verified at the connector at the coil on the Purge Valve.
R1
R2
R3
R4
R5
R6
L2/N
L1
Summary of Contents for CIM0320
Page 3: ...ELEVATION SERIES CIM CUBERS TABLE OF CONTENTS ...
Page 36: ...ELEVATION SERIES CIM CUBERS BUTTON FUNCTIONS 33 ...
Page 51: ...ELEVATION SERIES CIM CUBERS EVAPORATOR REPLACEMENT 48 ...
Page 67: ...ELEVATION SERIES WIRING DIAGRAM 64 CIM0530 0636 0836 1126 and 1136 REMOTE COOLED UNITS ...
Page 68: ...ELEVATION SERIES WIRING DIAGRAM 65 CIM0535 0835 and 1135 REMOTE COOLED UNITS ...