
9
Chapter 1: Overview
Before installing the SAN Router
This section describes the materials and tools required for installing
the SAN Router, the contents of the shipping carton, and safety
precautions to observe during installation.
Required tools and materials
Before beginning the installation tasks, ensure that you have a
Phillips #2 screwdriver and the following hardware:
• Gigabit Ethernet cabling.
• Ethernet 10/100 Mbps cabling.
• Fibre Channel cabling.
• Standard 19-inch EIA-compliant equipment rack if you are
mounting the SAN Router in a rack.
• Maintenance terminal (VT-100 or a PC with terminal emulation
software) - the terminal is required to configure the SAN Router
management IP address.
• Fiber-optic cleaning kit - The kit contains tools and instructions to
clean fiber-optic cable, connectors, loopback plugs, and protective
plugs.
Package contents
Unpack the contents of the shipping package and verify that you
have received the following items in good condition:
• The SAN Router unit with two power cords.
• Rack Mount Kit.
• RS-232 serial cable.
• Four SFP optics are included for multi-mode Fiber connectivity.
• Release Notes.
• Software and Documentation CD.
• Two power cord retainers.
• Torx Tool T10 (used with the rack mount kit only).
If any items are damaged or missing, contact IBM:
Summary of Contents for SAN04M-R
Page 2: ......
Page 8: ...SAN04M R SAN Router Installation And Service Manual vi...
Page 10: ...SAN04M R SAN Router Installation And Service Manual viii...
Page 12: ...SAN04M R SAN Router Installation And Service Manual x...
Page 60: ...SAN04M R SAN Router Installation And Service Manual 36...
Page 72: ...SAN04M R SAN Router Installation And Service Manual 48...
Page 82: ...SAN04M R SAN Router Installation And Service Manual 58...
Page 95: ......
Page 96: ...Printed in USA GC26 7764 02...