8-15
CHAIN
Chain sheave(V mast)
Place a sling around carriage and attach
to an overhead hoist. Lift carriage high
enough so that the tension on the chain
over sheaves is relieved after the carriage
is blocked. Position wooden blocks under
the carriage and lower it.
Remove the split pin securing the chain
anchor pins and discard. While
supporting the chains, remove the chain
anchor pins and drape the chains over the
carriage.
Remove retaining ring securing sheaves
to sheave support. Remove sheaves
with bearings.
Remove bearing retaining ring from
sheave and press bearings from sheaves.
Thoroughly clean, inspect and replace all
worn or damaged parts.
Reverse the above to assemble and install.
Use new split pins in chain anchor pins.
6)
(1)
①
②
③
④
⑤
⑥
Outer mast
Chain
Carriage
Anchor
bolt
Sheave
Inner mast
Split pin
60L7AMS19
Carriage
Free lift cylinder
Inner mast
Anchor
bolt
Chain
Chain
Middle mast
Split pin
60L7AMS14
Rear chain sheave(TF mast)
Raise and securely block carriage and
inner mast section.
Remove the split pin securing the chain
anchor pins and discard. While
supporting the chains, remove the chain
anchor pins from outer mast section.
Remove chains.
Remove retaining ring securing chain
sheaves to sheave support. Pry off
sheaves with bearings.
Remove bearing retaining ring from
sheave and press bearings from
sheaves.
Thoroughly clean, inspect and replace all
worn or damaged parts.
Reverse the above procedure to
assemble and install. Use new split pins
in chain anchor pins.
(2)
①
②
③
④
⑤
⑥
⑦
Summary of Contents for 60L-7A
Page 32: ...2 7 Mast Refer to section on mast Page 2 2 1 2 POWER TRAIN ASSEMBLY REMOVAL 1 D503RE04 ...
Page 69: ...3 28 50DFTM13 Remove bearing 67 and gear 68 30 68 67 ...
Page 71: ...3 30 Remove oil seal 72 from the transmission case 34 50DFTM17 72 ...
Page 188: ...7 3 10MM RING ELECTRIC CIRCUIT FOR LPG FUE KIT 35L7AEL07 ...
Page 189: ...7 4 MEMORANDUM ...