6-4
Load check
valve
2
9
10
LS
CF
EF
T/M
14
Steering system
Steering return line
Brake system
Brake return line
1
12
8
11
7
3
18.5MPa
15MPa
P
T
24V
24V
1B
1A
2B 2A
3B
3A 4B
4A
GAGE PORT
Tilt
forward
50DS7EHS04
WHEN THE TILT CONTROL LEVER IS IN THE FORWARD POSITION
3)
When the tilt control lever is pushed forward, the spool on the second block is moved to tilt forward
position.
The oil from hydraulic gear pump(1) flows into main control valve(3) and then goes to the large
chamber of tilt cylinder(7) by pushing the load check valve of the spool.
The oil at the small chamber of tilt cylinder(7) returns to hydraulic tank(14) at the same time.
When this happens, the mast tilt forward.
Summary of Contents for 60L-7A
Page 32: ...2 7 Mast Refer to section on mast Page 2 2 1 2 POWER TRAIN ASSEMBLY REMOVAL 1 D503RE04 ...
Page 69: ...3 28 50DFTM13 Remove bearing 67 and gear 68 30 68 67 ...
Page 71: ...3 30 Remove oil seal 72 from the transmission case 34 50DFTM17 72 ...
Page 188: ...7 3 10MM RING ELECTRIC CIRCUIT FOR LPG FUE KIT 35L7AEL07 ...
Page 189: ...7 4 MEMORANDUM ...