Installation and Maintenance Manual
6
Tools Required for an Efficient Installation
5. Hammer
6. Screwdriver sets,
Straight and Phillips
7. Wrench set, open end,
1
/
4
" through 1"
8. Electric drill and bits,
1
/
8
" through
3
/8"
9. Roto-hammer and bits,
3
/
8
" &
1
/
2
"
10. Level—it doesn’t need to look
like this one, but the installation
needs to be level!
11. Two pair wide jaw vice
grip pliers, or two C clamps,
4" capacity
4. Allen wrench set
3. Concrete anchor
bolts, four
1
/
2
" x 4"
2. Carpenters
pencil or crayon
1. Chalkline or other
builders string
Summary of Contents for HTG 320-2
Page 18: ...Installation and Maintenance Manual 10 Components of the Barrier Arm Gate Operator ...
Page 21: ...Installation and Maintenance Manual 13 46 ...
Page 22: ...Installation and Maintenance Manual 14 46 ...
Page 23: ...Installation and Maintenance Manual 15 ...
Page 43: ...Installation and Maintenance Manual 35 E95 ...
Page 48: ...Installation and Maintenance Manual 40 24 hr 7 day Timer Connection to Smart Touch Controller ...
Page 57: ...Installation and Maintenance Manual 49 24V 110A H BATTERY POWER SUPPLY FOR DC OPERATORS ...
Page 59: ...Installation and Maintenance Manual 51 ...
Page 60: ...Installation and Maintenance Manual 52 Parts Breakout ...
Page 61: ...Installation and Maintenance Manual 53 Parts Breakout ...
Page 62: ...Installation and Maintenance Manual 54 Parts Breakout AC Pumps MX000234 HVABY 000 CRT ...
Page 63: ...Installation and Maintenance Manual 55 Parts Breakout DC Pumps MX000234 HVABY 000 CRT ...
Page 64: ...Installation and Maintenance Manual 56 Parts Breakout ...
Page 67: ...Installation and Maintenance Manual 59 Smart Touch Controller Connections ...
Page 68: ...Installation and Maintenance Manual 60 Quick StrongArm Brake Valve adjustment Procedure ...