Installation and Maintenance Manual
7
Installation Preparation Checklist
1. Read
all
of the instructions, especially the
Important Information in Section 1 at the
beginning of this manual, before you attempt
installation. This section is focused upon
mechanical installation. For electrical setup,
refer to Section 3, on system configuration
and use of the Smart Touch Controller.
2. Pour a concrete mounting slab that is a
minimum of 20” x 20” x 20” with the electrical
conduits located correctly to enter the
chassis. Keep in mind that a space of 7 X 11”
just inside of the operator door is where the
conduits must enter into the operator.
HySecurity recommends a slab reaches
below the local frost line. See the footprint
plan and elevation view on pages 13-15.
Installation
1.
Drill four holes for concrete anchors
The operator must be mounted with four anchor bolts.
These will be 12.5” on center with a square pattern to
match the chassis base. Line up the operator so that the
end of the barrier arm is in the intended position. Place
the operator over the conduit and mark the mounting
holes. Once marked, remove the operator and drill for
½” min. anchor bolts.
2.
Line up the operator
Set the operator over the mounting bolts, align the
operator and securely tighten the bolts.
3.
Special two part operators
DC powered operators come with a separate power
enclosure. This enclosure should be mounted
within 20 feet of the operator. We recommend wall
mounting or using two 4” posts, with horizontal
mounting strut to create a support for this
enclosure. See also step 6 and section 8 on two
part operators.
Summary of Contents for HTG 320-2
Page 18: ...Installation and Maintenance Manual 10 Components of the Barrier Arm Gate Operator ...
Page 21: ...Installation and Maintenance Manual 13 46 ...
Page 22: ...Installation and Maintenance Manual 14 46 ...
Page 23: ...Installation and Maintenance Manual 15 ...
Page 43: ...Installation and Maintenance Manual 35 E95 ...
Page 48: ...Installation and Maintenance Manual 40 24 hr 7 day Timer Connection to Smart Touch Controller ...
Page 57: ...Installation and Maintenance Manual 49 24V 110A H BATTERY POWER SUPPLY FOR DC OPERATORS ...
Page 59: ...Installation and Maintenance Manual 51 ...
Page 60: ...Installation and Maintenance Manual 52 Parts Breakout ...
Page 61: ...Installation and Maintenance Manual 53 Parts Breakout ...
Page 62: ...Installation and Maintenance Manual 54 Parts Breakout AC Pumps MX000234 HVABY 000 CRT ...
Page 63: ...Installation and Maintenance Manual 55 Parts Breakout DC Pumps MX000234 HVABY 000 CRT ...
Page 64: ...Installation and Maintenance Manual 56 Parts Breakout ...
Page 67: ...Installation and Maintenance Manual 59 Smart Touch Controller Connections ...
Page 68: ...Installation and Maintenance Manual 60 Quick StrongArm Brake Valve adjustment Procedure ...