Installation and Maintenance Manual
58
Parts Breakout – DC Power Supply
Battery Pack Components
PART NUMBER
QTY
2-1
ESWCB 030 60
1 EA.
2-3
ESWOI 067 DCEX
1 EA.
2-4
ECOTS 1102
1 EA.
2-5
EENEN HOI 3030
1 EA.
2-7
EDCBY 12B 090
2 EA.
2-9
ECOTS 005
1 EA
2-10 ESWFU 010 15
1 EA
2-11 ESWFU 010 05
1 EA
2-12 ESWBU 001 BLK
1 EA
2-13 ECDBC 024 025
1 EA
2-14 EDCFV 001
1 EA
2-15 EACTH B10 021
1 EA
Summary of Contents for HTG 320-2
Page 18: ...Installation and Maintenance Manual 10 Components of the Barrier Arm Gate Operator ...
Page 21: ...Installation and Maintenance Manual 13 46 ...
Page 22: ...Installation and Maintenance Manual 14 46 ...
Page 23: ...Installation and Maintenance Manual 15 ...
Page 43: ...Installation and Maintenance Manual 35 E95 ...
Page 48: ...Installation and Maintenance Manual 40 24 hr 7 day Timer Connection to Smart Touch Controller ...
Page 57: ...Installation and Maintenance Manual 49 24V 110A H BATTERY POWER SUPPLY FOR DC OPERATORS ...
Page 59: ...Installation and Maintenance Manual 51 ...
Page 60: ...Installation and Maintenance Manual 52 Parts Breakout ...
Page 61: ...Installation and Maintenance Manual 53 Parts Breakout ...
Page 62: ...Installation and Maintenance Manual 54 Parts Breakout AC Pumps MX000234 HVABY 000 CRT ...
Page 63: ...Installation and Maintenance Manual 55 Parts Breakout DC Pumps MX000234 HVABY 000 CRT ...
Page 64: ...Installation and Maintenance Manual 56 Parts Breakout ...
Page 67: ...Installation and Maintenance Manual 59 Smart Touch Controller Connections ...
Page 68: ...Installation and Maintenance Manual 60 Quick StrongArm Brake Valve adjustment Procedure ...