35
Tuff Torq K61 Hydrostatic Transaxle
Brake Assembly
1. Install the Brake Drum and Snap Ring onto Motor Shaft.
(Fig. 49)
2. Install the Brake Band Assembly; tighten (3) Bolts by
hand.
(Fig. 48, 49)
Clean oil and dust from the Brake Band and
Brake Drum before installing.
3. Center the Brake Band around the Brake Drum by manu-
ally activating (left to right) the Engagement Lever.
While maintaining pressure to the Engagement Lever,
tighten (using a 12 mm wrench) the (3) Bolts.
Tightening torque:
2.3 ~ 3.0 kg-m
22.6 ~ 29.5 N-m
17 ~ 21 ft. lbs.
4. Attach the Brake Rod Assembly to the Brake Arm.
5. Adjust the Brake Rod to align with the Engagement
Lever and connect.
6. Connect the Washer and Cotter Pin.
7. Confirm that the Band Brake is properly aligned and
working smoothly.
8.
(If Applicable)
Connect one end of the Shock Absorber
to the Control Arm and the opposite end to the stud on
Upper Case, using the appropriate hardware, i.e., Spring
Clips or Cotter Pin.
(Fig. 49)
Fig. 48, Brake Band Assembly
Fig. 49, Brake Band Installation