44
Remove Excess Cord
Pull on the end of the cord at the cord
tensioner to release the slip knot.
Pull cord to create tension.
Re-tie a knot at the cord tensioner.
Trim the excess cord.
Adjust The Cord Tension
Test The Shade
Move the moving rail to check the
shade tension. The moving rail should
slide easily, yet there should be enough
cord tension to hold the shade in place at
any position.
Decrease the cord tension
if the moving rail does not
move smoothly.
Increase the cord tension if the rail
does not hold its position.
Adjust The Cord Tension
To tension: slide the cord tensioner
away from the end plate until you
feel resistance.
Continue to slide the cord in 1"
increments to make the moving
rail hold its position. Repeat
if necessary.
1.
2.
3.
4.
■
■
■
■
Slip Knot
1.
2.
3.
Cord
Tensioner
Top Rail
SHADE ADJUSTMENT
Summary of Contents for Vertiglide Applause Honeycomb
Page 1: ...Duette and Applause Honeycomb Shades Vertiglide Shades Installation and Care Instructions...
Page 19: ...19 INSIDE AND CEILING MOUNT INSTALLATION...
Page 32: ...32...
Page 33: ...33 TRADITIONAL ON THE FLOOR INSIDE AND OUTSIDE MOUNT INSTALLATION...
Page 42: ...42...
Page 43: ...43 FINAL ADJUSTMENTS...