OPERATION MANUAL
V2.3.0en/22.04.20//17.12
Heat Transfer Station eo
7
Table of contents
V2.3.0en/22.04.20//17.12
Details on the declaration of conformity ....................................................... 12
Responsible bodies and operators – Obligations and requirements............... 14
Proper disposal of resources and consumables ......................................... 15
Exemplary illustrations of the cooling variants .............................................. 18
Consequence of inadequate energy dissipation ............................................. 18
Lifting and transporting the temperature control unit ................................... 20
Temperature control unit with lifting eyes ................................................ 20
Temperature control unit without lifting eyes ........................................... 21
Positioning the temperature control unit ....................................................... 22
Temperature control unit with casters ...................................................... 22
Temperature control unit without casters ................................................. 22
Recommended temperature control and cooling water hoses ...................... 25
Temperature control units with water cooling .............................................. 26
Check the knurled screw from the >Emptying of residues< [10]. ................... 28
Connecting an externally open application ................................................... 28
Connecting an externally open application (bath) .......................................... 28
Connection using socket with protective earth (PE) ....................................... 28