PowerCube 5000
User Manual (SmartLi 100Ah)
5 Power-on Commissioning
Issue 02 (2020-03-17)
Copyright © Huawei Technologies Co., Ltd.
99
If the green power indicator on the front panel of the BPS is on, the BPS works normally. If the red
indicator is on, the DG input phase sequence may be reverse or the input voltage frequency may exceed
the limit. In this case, they need to be checked.
----End
5.3 Setting Parameters for the ICC Cabinet
Context
The ICC cabinet is powered on for the first time.
Table 5-1
Description of system users
Default User
Preset Password
Permission
admin
(administrator)
MDU
012589
Has the rights to perform all the functions on
the MDU, including viewing system running
information, setting parameters, and
maintaining the system.
Web
Changeme
engineer
(engineer user)
MDU
000001
Has rights to view and set system information.
Web
Changeme
Procedure
Step 1
Perform quick settings.