PowerCube 5000
User Manual (SmartLi 100Ah)
3 Installation
Issue 02 (2020-03-17)
Copyright © Huawei Technologies Co., Ltd.
77
Ensure that the upstream AC input circuit breaker is OFF, and that the warning label "Do
not operate" is attached.
Switch off all circuit breakers before installing cables.
Procedure
Step 1
Prepare a cable of suitable length and install cord end terminals or OT terminals on both ends
of the cable.
Step 2
Install an AC input power cable.
Figure 3-26
Installing an AC input power cables for a DG
(1) DG