PowerCube 5000
User Manual (SmartLi 100Ah)
3 Installation
Issue 02 (2020-03-17)
Copyright © Huawei Technologies Co., Ltd.
73
Figure 3-21
Installing leveling feet
Step 2
Secure the IP21 component to the top of each cabinet.
Figure 3-22
Installing an IP21 component
----End
3.5.5 (Optional) Installing a Water Sensor
Prerequisites
A water sensor is provided.
Procedure
Step 1
Install a water sensor at the bottom left of the cabinet and secure it with a cable tie.
Step 2
Connect the signal cable of the water sensor to the WATER terminal on the BCU.