PowerCube 5000
User Manual (SmartLi 100Ah)
3 Installation
Issue 02 (2020-03-17)
Copyright © Huawei Technologies Co., Ltd.
65
Ensure that the installation position is flat.
The marking-off template is delivered with the cabinet.
Figure 3-9
Hole dimensions (unit: mm)
(A) Mounting holes on the channel steel
(B) Mounting holes on the floor
Installing the Cabinet on the Ground
Step 1
Determine the cabinet installation positions on the floor based on holes in the marking-off
template for floor installation.
Step 2
Drill holes and install expansion sleeves.
Step 3
Use a pallet truck to move the cabinet to the installation position.
Step 4
Use M12x60 expansion bolts to secure the cabinet to the floor.