PowerCube 5000
User Manual (SmartLi 100Ah)
7 Routine Maintenance
Issue 02 (2020-03-17)
Copyright © Huawei Technologies Co., Ltd.
115
Maintenanc
e Item
Operation
Guide
Expected Result
Troubleshooting Measures
enhancing ventilation.
Alarm
information
The isolation
transformer does not
have an
overtemperature or
ultra overtemperature
alarm.
The monitoring unit
reports an overtemperature
alarm for the isolation
transformer. If the alarm is
generated repeatedly
within one week, you are
advised to check for a fan
fault onsite.
The monitoring unit
reports an ultra
overtemperature alarm for
the isolation transformer.
You need to check onsite
immediately and clear the
alarm.
Fan
Visual
observation
Dust does not
accumulate on the
fan.
Clean the dust.
Visual
observation and
listening
The fan is intact, and
the rotation speed,
noise, and vibration
are in normal ranges.
Replace the fan.
Appearance
Visual
observation
The paint or
electroplated coating
on the cabinet is
intact.
Repaint and repair the
enclosure.
Grounding
Visual
observation and
using a tool
such as a
screwdriver or
wrench
The ground point is
properly connected to
the equipment room
ground bar.
Secure the ground point or
replace the ground cable.
7.2 ICC Routine Maintenance
Maintain the integrated controller and converter (ICC) periodically based on site requirements.
The recommended maintenance interval is six months. If any faults occur, rectify them in
time.
Table 7-2
ICC routine maintenance checklist
Maintenance
Item
Operation
Guide
Expected Result
Troubleshooting Measures