ODU
OAU 2A
1
2
OAU 2A
1
2
OAU 2A
1
4
2
OAU 2A
OAU 2A
1
3
1
Select ground points for the outdoor network cable.
Ground the outdoor network cable at the following positions:
1.
About 0.5 m to 1 m away from the port
2.
About 0.5 m to 1 m (1.64 feet to 3.28 feet) before the cable is routed into the equipment room or outdoor cabinet
3.
About 1 m before the cable leaves the tower and runs toward the outdoor cable tray
4.
About 1 m before the cable leaves the roof cable ladder
Select ground points for the DC cable.
Ground the DC cable at the following positions:
1.
About 0.5 m to 1 m (1.64 feet to 3.28 feet) before the cable is routed into the equipment room or outdoor cabinet
2.
About 1 m before the cable leaves the tower and runs toward the outdoor cable tray
3.
About 1 m before the cable leaves the roof cable ladder
OAU 2A
3
2
1
ODU
OAU 2A
1
OAU 2A
2
1
18
Selecting ground points
Installation Reference