PWR
1
4
5
3
For the method of making and laying out an IF cable, see the
RTN XMC
ODU Quick Installation Guide
.
2
Connected to a
power supply
device
1
Install an OAU 2A on a wall or pole.
• Determine whether to install an OAU 2A on a wall or pole based on
actual conditions.
• If an OAU 2A needs to be installed on a tower, it is recommended that
you install it at the foot of the tower to facilitate maintenance.
2
Install a ground cable.
3
Install an outdoor fiber or network cable.
The GE1(e) or GE2(e) port can be used
to transmit/receive electrical services,
and the GE3(o) or COMBO port can be
used to transmit/receive optical services.
In this example, the GE3(o) port is used.
• Connect an outdoor fiber or network cable to a port in the
maintenance compartment.
• Lay out the outdoor fiber or network cable.
• Attach a yellow label to the fiber or network cable, and write a
number on the label according to the plan.
4
Install a DC power cable.
• Connect a DC power cable to the DC power port in the maintenance
compartment.
• Lay out the DC power cable.
• Select ground points for the DC power cable, and install ground clips.
• Attach a matte white label to the DC power cable.
5
For the method of installing an
XMC ODU and an OMT, see the
RTN XMC ODU Quick Installation
Guide
.
Install IF cables.
Connect the IF ports of the OAU 2A and each XMC ODU using an
IF cable.
6
Installation procedure
Before installing a cable, bind the cable section that links the cable
connector to the pole. This will protect the cable connector from damage.
Ensure that the length of cable running from the binding point to the OAU
2A is sufficient to attach the cable connector to a service port on the OAU
2A.
GE3(o)
To a NodeB
For the method of installing an antenna,
follow the antenna installation guide
delivered with the antenna.
Waterproof ground clips and IF cable connectors.
IF2
IF1
3
Do not remove or insert an IF cable connector from or to the OAU 2A with
power on. Otherwise, human injuries may be caused.
Install the device-side ground cable before you climb up the tower.
10
Grounded using
a ground clip
DC
power
cable
DC
power
cable
6
6
6
6
6
Use the W eb LCT to configure NE data.
Align antennas.
Power on the OAU 2A.
Commissioning procedure
1
2
3
Installing the OAU 2A
3
Installation at an XPIC Site
Check the installation.
4
You can use an alignment scope to
align antennas. For details about how
to install an alignment scope, see the
appendix.