Index 105
J
Japanese notice 87
L
LEDs, drive 13
LEDs, hard drive 13
LEDs, power supply 8
LEDs, SAS hard drive 13
LEDs, troubleshooting 85
LEDs, unit identification (UID) 8
M
memory subsystem architecture 31
memory, configuration requirements 33, 34, 35
N
O
online spare memory 33, 34, 80
operating systems 84
operations 14
optimum environment 19
Option ROM Configuration for Arrays (ORCA) 74,
options installation 19, 26, 38, 48
ORCA (Option ROM Configuration for Arrays) 74,
P
PCI expansion slots 48
phone numbers 91
population guidelines, Advanced ECC 34
power distribution unit (PDU) 21
Power On button 14
power requirements 21
power supply 90
power supply LEDs 8
powering down 14
preparation procedures 14
problem diagnosis 85
processor option 26
R
rack mounting hardware 22
rack resources 19
rack warnings 21
RBSU (ROM-Based Setup Utility) 74, 78, 79, 80
RBSU configuration 78
rear panel components 8
rear panel LEDs 8
redundant power supply 56
redundant ROM 82
regulatory compliance notices 87, 88
remote support and analysis tools 77
removing server from chassis 14
requirements, airflow 20
requirements, power 21
requirements, space 20
requirements, temperature 20
ROM redundancy 82
ROM-Based Setup Utility (RBSU) 65, 78
S
safety considerations 21, 83, 87, 89
SAS drives 13
scripted installation 77
serial number 80
series number 87
server features and options 26
server, installation 14
shipping carton contents 22
space requirements 20
specifications 90
static electricity 89
support 91
supported operating systems 84
system battery 85
system board components 9
System Erase Utility 77
system maintenance switch 11
T
Taiwan battery recycling notice 87
telephone numbers 91
temperature requirements 20
TPM (Trusted Platform Module) 65, 69
TPM connector 9
troubleshooting 85
Trusted Platform Module (TPM) 65, 69
U
UID LED 8
updating the system ROM 82
USB support 82
Summary of Contents for ProLiant SL270s Gen8
Page 16: ...Operations 16 5 Remove the shipping plates 6 Remove the hard drive cage...
Page 17: ...Operations 17 7 Loosen screws securing the GPU shelf 8 Remove the GPU shelf...
Page 36: ...Hardware options installation 36 5 Remove the shipping plates 6 Remove the hard drive cage...
Page 47: ...Hardware options installation 47 o Left node o Right node...
Page 49: ...Hardware options installation 49 5 Remove the shipping plates 6 Remove the hard drive cage...
Page 50: ...Hardware options installation 50 7 Loosen screws securing the GPU shelf 8 Remove the GPU shelf...
Page 53: ...Hardware options installation 53 4 Remove all shipping brackets 5 Remove the shipping plates...
Page 55: ...Hardware options installation 55 8 Remove the GPU shelf 9 Remove the PCI cage...
Page 59: ...Hardware options installation 59 5 Remove the shipping plates 6 Remove the hard drive cage...
Page 60: ...Hardware options installation 60 7 Loosen screws securing the GPU shelf 8 Remove the GPU shelf...
Page 72: ...Cabling 72 Right node Capacitor pack to FBWC on controller card cabling o Left node...
Page 73: ...Cabling 73 o Right node...
Page 97: ...Support and other resources 97...
Page 98: ...Support and other resources 98...
Page 106: ...Index 106 V ventilation 19 W warnings 21 website Hewlett Packard Enterprise 91...