Index 104
A
ACU (Array Configuration Utility) 74, 80
Advanced ECC memory 33, 34, 80
Advanced ECC support 33
Array Configuration Utility (ACU) 80
ASR (Automatic Server Recovery) 82
auto-configuration process 79
Automatic Server Recovery (ASR) 82
B
boot options 79
BSMI notice 87
C
cables 71
cautions 89
Change Control 84
chassis, removing server 14
CMOS (complementary metal-oxide
semiconductor) 11
components 6
components, identification 6, 8, 10, 12
components, system board 9, 11
configuration of system 74
connectors 6
contacting Hewlett Packard Enterprise 91
D
Declaration of Conformity 87, 88
default settings 33
device numbers 12
diagnosing problems 85
diagnostics utility 76
DIMM installation guidelines 32, 34, 35
DIMM population guidelines 34
DIMM slot locations 10
DIMM slots 34
DIMMs, dual-rank 31
DIMMs, quad-rank 31
DIMMs, single- and dual-rank 31
drive LEDs 13
drivers 83
drives, installing 38
E
electrical grounding requirements 21
electrostatic discharge 89
environmental requirements 19
European Union notice 87
expansion board 48
F
Federal Communications Commission (FCC)
notice 87
front panel components 6
G
general diagnosis flowchart 7
grounding methods 89
H
hard drive blanks 39
hard drive LEDs 13
hard drives, determining status of 13
hardware options 26
hardware options installation 26
health driver 82
health LEDs 6
Hewlett Packard Enterprise website 91
HP Trusted Platform Module option 65, 69
HPE Insight Diagnostics 76, 77
HPE SmartMemory 30
I
iLO (Integrated Lights-Out) 74, 75, 76
IML (Integrated Management Log) 74, 76
installation services 19
installation, server options 26
installing hardware 26
Integrated Lights-Out (iLO) 74, 76
Integrated Management Log (IML) 76
Index
Summary of Contents for ProLiant SL270s Gen8
Page 16: ...Operations 16 5 Remove the shipping plates 6 Remove the hard drive cage...
Page 17: ...Operations 17 7 Loosen screws securing the GPU shelf 8 Remove the GPU shelf...
Page 36: ...Hardware options installation 36 5 Remove the shipping plates 6 Remove the hard drive cage...
Page 47: ...Hardware options installation 47 o Left node o Right node...
Page 49: ...Hardware options installation 49 5 Remove the shipping plates 6 Remove the hard drive cage...
Page 50: ...Hardware options installation 50 7 Loosen screws securing the GPU shelf 8 Remove the GPU shelf...
Page 53: ...Hardware options installation 53 4 Remove all shipping brackets 5 Remove the shipping plates...
Page 55: ...Hardware options installation 55 8 Remove the GPU shelf 9 Remove the PCI cage...
Page 59: ...Hardware options installation 59 5 Remove the shipping plates 6 Remove the hard drive cage...
Page 60: ...Hardware options installation 60 7 Loosen screws securing the GPU shelf 8 Remove the GPU shelf...
Page 72: ...Cabling 72 Right node Capacitor pack to FBWC on controller card cabling o Left node...
Page 73: ...Cabling 73 o Right node...
Page 97: ...Support and other resources 97...
Page 98: ...Support and other resources 98...
Page 106: ...Index 106 V ventilation 19 W warnings 21 website Hewlett Packard Enterprise 91...