Installing and Configuring the Director 2/64
54
Director 2/64 Installation Guide
3. Count up 5 square openings from the cage nut you just installed, and insert the
next cage nut.
4. Count up four square openings and install the third cage nut.
5. Repeat this procedure to install cage nuts in the corresponding front rail.
Insert the Rear Cage Nuts in the Rack
Use these steps to insert the four supplied cage nuts in the rack’s rear rails:
1. Select one of the rear rails.
2. Count up six square openings from the top screw of the rear shelf bracket.
Insert the first of two cage nuts.
3. Count up sixteen square openings from the cage nut you just installed, and
insert the next cage nut.
4. Repeat this procedure to install cage nuts in the corresponding rear rail.
Finalize the Rack Mounting Procedure
Use the following sections to complete the installation procedure.
After completing the steps outlined in the previous sections, prepare to orient the
switch in the rack as follows.
WARNING:
The Director 2/64 weighs approximately 115 pounds. Use
proper handling and lifting equipment to reduce the possibility of injury or
product damage.
1. Carefully lift the switch into the front of the rack and onto the shelf brackets
and slide the switch forward into the rack until the edge of the rear mounting
plates are approximately 1 inch from the rack’s rails, as shown in
Figure 12
.
2. Align one rear angle bracket with the cage nuts installed earlier, as shown in
“
Insert the Cage Nuts
” on page 53.
Note:
Make sure that the angle bracket is in contact with the outside surface of the
mounting plate.