Installing and Configuring the Director 2/64
51
Director 2/64 Installation Guide
3. Locate the square opening in the rail that corresponds with the appropriate
marker hole, as shown in
Figure 10
.
4. Position the higher, shelf bracket threaded hole in this square opening, as
shown in
Figure 10
.
5. Orient the shelf bracket in the rails.
6. Place the square washer provided on the front of the rail so that the two bumps
on the washer sit in opposite corners in the rail’s square hole.
7. Insert the panhead Phillips screw, and partially tighten to temporarily stabilize
the bracket.
8. Make sure the shelf bracket is level, and align the rear of the shelf bracket
with the appropriate position on the rear rail, as shown in
Figure 10
.
9. Repeat
step 4
through
step 7
for the rear end of the shelf bracket.
10. Repeat
step 1
through
step 9
for the second shelf bracket.
11. Completely tighten all screws attaching shelf brackets to the rack’s rails.
12. Using a torque driver, torque the screws to 22 in/lb.
Prepare the Switch for Installation
The following section describes how to install the mounting hardware that
attaches the switch to the rails. This hardware includes:
■
Two front mounting brackets
■
Two rear mounting plates
■
Ten cage nuts
■
Eight screws