Product Overview 37
Product Over
view
Note
Using software to perform a shutdown is the preferred method
because confirmation of a successful shutdown is reported to the
operator.
If the power fails or if you unplug the power cords without performing a
shutdown, the following sequence will occur when the array is powered on
again:
1
The array will attempt to retrieve the maps from cache and determine if they
are valid.
2
If the maps are not valid, the array will retrieve the maps from the image
disks.
Note
If power to the array is lost by any means other than by moving
the power/standby switch to the standby position, the array will
not have time to perform a successful shutdown. In this case, a
fully charged battery can sustain NVSDRAM contents for 3
days.
Summary of Contents for StorageWorks 7110 - Virtual Array
Page 12: ...12 Contents ...
Page 54: ...54 Product Overview Figure 21 VA 7110 I O Architecture ...
Page 90: ...90 Troubleshooting ...
Page 116: ...116 Servicing Upgrading Figure 45 Removing Installing an Array Controller Filler Panel 1 2 3 ...
Page 129: ...Servicing Upgrading 129 Servicing Upgrading Figure 52 Removing and Installing an LCC 1 2 3 ...
Page 130: ...130 Servicing Upgrading Figure 53 Setting the FC Loop Speed Switch Must be set to 1GB s ...
Page 149: ...Specifications Regulatory Statements 149 Specifications Regulatory Statements ...
Page 151: ...Specifications Regulatory Statements 151 Specifications Regulatory Statements ...
Page 152: ...152 Specifications Regulatory Statements ...
Page 164: ...164 Index ...