118 Servicing & Upgrading
Figure 46
Removing & Installing an Array Controller Battery
Installing an Array Controller Battery
1
Seat the battery connector (
Figure 47
, 1) on the battery terminal (2).
2
Lay the battery (
Figure 47
, 3) on the foam pad (4) and in the battery
bracket (5).
3
Place the battery clamp (
Figure 46
, 2) on the battery (3).
4
Slide the battery clamp forward so that the front tabs (
Figure 46
, 4) are
positioned under the bulkhead tabs (5).
5
Tighten the battery clamp screw (
Figure 46
, 1) with a T-20 driver.
6
Replace the array controller card. See
"Installing an Array Controller" on
page 110
.
Note
If the array controller battery was replaced on a single array
controller, wait for the battery to charge before resuming I/Os.
5
4
2
3
1
Summary of Contents for StorageWorks 7110 - Virtual Array
Page 12: ...12 Contents ...
Page 54: ...54 Product Overview Figure 21 VA 7110 I O Architecture ...
Page 90: ...90 Troubleshooting ...
Page 116: ...116 Servicing Upgrading Figure 45 Removing Installing an Array Controller Filler Panel 1 2 3 ...
Page 129: ...Servicing Upgrading 129 Servicing Upgrading Figure 52 Removing and Installing an LCC 1 2 3 ...
Page 130: ...130 Servicing Upgrading Figure 53 Setting the FC Loop Speed Switch Must be set to 1GB s ...
Page 149: ...Specifications Regulatory Statements 149 Specifications Regulatory Statements ...
Page 151: ...Specifications Regulatory Statements 151 Specifications Regulatory Statements ...
Page 152: ...152 Specifications Regulatory Statements ...
Page 164: ...164 Index ...