
Switch Management
90
Web Tools Version 3.1.x/4.1.x User Guide
If the HA Summary field displays Disruptive Failover Ready, click the
Synchronize Services Button and wait for the CPs to complete a
synchronization of services, so that a Non-Disruptive Failover is ready.
Once the HA Summary field displays Non-Disruptive Failover Ready a
failover can be initiated without disrupting frame traffic on the fabric.
Initiating a CP Failover
Perform the following steps to initiate a CP failover.
1. Launch the web browser.
2. Enter the IP address in the Location/Address field and press Enter.
Example:
http://123.123.123.123
Web Tools launches, displaying Switch Explorer view.
3. Click a switch in the Fabric Tree.
The Switch graphic appears.
4. Click the Hi Avail icon on the switch panel.
The HA Admin window appears as shown in
Figure 17
.
5. Verify that HA Summary field displays Non-Disruptive Failover Ready or
Disruptive Failover Ready. See “
Synchronizing Services on the CP
” on
page 89 for more information.
6. Click the Initiate Failover button. A non-disruptive failover may take a few
minutes to complete. You may lose connection to the switch for a few minutes
during the Failover. Web Tools will automatically resume the connection after
the failover.
Summary of Contents for StorageWorks 2/32 - SAN Switch
Page 22: ...About this Guide 22 Web Tools Version 3 1 x 4 1 x User Guide ...
Page 44: ...Installation 44 Web Tools Version 3 1 x 4 1 x User Guide ...
Page 186: ...Fabric Watch 186 Web Tools Version 3 1 x 4 1 x User Guide ...
Page 248: ...Zone Administration 248 Web Tools Version 3 1 x 4 1 x User Guide ...
Page 270: ...Troubleshooting Web Tools 270 Web Tools Version 3 1 x 4 1 x User Guide ...