Operations 29
5.
If a full-length expansion board is installed in slot 1, release the full-length expansion board retainer,
and then remove the primary PCIe riser cage.
6.
If a full-length expansion board is installed in slot 4, release the full-length expansion board retainer,
and then remove the secondary PCIe riser cage.
7.
Remove the full-length expansion board.
To install the component, reverse the removal procedure.
Remove the primary PCIe riser cage
CAUTION:
To prevent damage to the server or expansion boards, power down the server and
remove all AC power cords before removing or installing the PCIe riser cage.
1.
Power down the server (on page
23
).
2.
Remove all power:
Summary of Contents for ProLiant DL385p Gen8
Page 6: ...Contents 6 Documentation feedback 132 Index 133 ...
Page 65: ...Hardware options installation 65 o 8 or 16 drive SFF o 8 drive LFF ...
Page 91: ...Cabling 91 LFF hard drive cabling Optical drive cabling ...
Page 92: ...Cabling 92 FBWC cabling 8 or 16 drive SFF 8 drive LFF ...
Page 127: ...Support and other resources 127 ...
Page 128: ...Support and other resources 128 ...