Operations 33
7.
Secure the full-length expansion board retainer.
8.
Install the access panel (on page
25
).
9.
Install the server into the rack ("
Installing the server into the rack
" on page
40
).
10.
Connect each power cord to the server.
11.
Connect each power cord to the power source.
12.
Power up the server (on page
23
).
Secure the secondary PCIe riser cage full-length
expansion board retainer
1.
Power down the server (on page
23
).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Extend the server from the rack (on page
23
).
4.
Remove the access panel (on page
25
).
5.
Install a full-length expansion board ("
Installing a full-length expansion board
" on page
73
).
6.
Install the secondary PCIe riser cage ("
Secondary PCIe riser cage option
" on page
74
).
Summary of Contents for ProLiant DL385p Gen8
Page 6: ...Contents 6 Documentation feedback 132 Index 133 ...
Page 65: ...Hardware options installation 65 o 8 or 16 drive SFF o 8 drive LFF ...
Page 91: ...Cabling 91 LFF hard drive cabling Optical drive cabling ...
Page 92: ...Cabling 92 FBWC cabling 8 or 16 drive SFF 8 drive LFF ...
Page 127: ...Support and other resources 127 ...
Page 128: ...Support and other resources 128 ...