Hardware options installation 85
SAS cables can be connected to the PCIe riser cage and the system board before or after the PCIe riser
cage is installed. For ease in accessing connectors, HP recommends connecting the cables before the
PCIe riser cage is installed.
Completed SAS cabling:
22.
Make sure any installed full-length expansion boards are seated in the retainer clip on the air baffle.
23.
Install the access panel (on page
25
).
24.
Install the server into the rack.
25.
Connect each power cord to the server.
26.
Connect each power cord to the power source.
27.
Power up the server (on page
23
).
Summary of Contents for ProLiant DL385p Gen8
Page 6: ...Contents 6 Documentation feedback 132 Index 133 ...
Page 65: ...Hardware options installation 65 o 8 or 16 drive SFF o 8 drive LFF ...
Page 91: ...Cabling 91 LFF hard drive cabling Optical drive cabling ...
Page 92: ...Cabling 92 FBWC cabling 8 or 16 drive SFF 8 drive LFF ...
Page 127: ...Support and other resources 127 ...
Page 128: ...Support and other resources 128 ...