2.
To install the hard drive, push in the drive and then close the locking lever.
Installing a hot-swappable power supply
The server has at least one hot-swappable power supply installed before shipping. This power
supply is located at the rear of the server. You can install a second, optional power supply to
provide N+1 capability.
Figure 20 Power supply loading guidelines
2
1
Power supply bay 1
Power supply bay 2
CAUTION:
Observe all ESD safety precautions before attempting this procedure. Failure to follow
ESD safety precautions might result in damage to the server.
CAUTION:
If you do not purchase a second power supply, the empty power supply slot must
remain covered with the supplied power supply blank. Failure to observe this caution might result
in server shutdown due to overheating.
NOTE:
The power supply is a hot-swappable device. You do not have to interact with the operating
system to add a power supply to the server.
HP Confidential
Installing a hot-swappable power supply
41