Contents
Internal components.............................................................................................................9
I/O subsystem...................................................................................................................11
RAID support.....................................................................................................................11
System power specifications................................................................................................14
Power consumption and cooling..........................................................................................15
Verifying site preparation...............................................................................................16
Inspecting the shipping containers for damage.................................................................17
Unpacking the server.....................................................................................................17
Verifying the inventory...................................................................................................17
Returning damaged equipment.......................................................................................17
Unloading the server with a lifter.....................................................................................17
Safety information..................................................................................................................18
Preventing electrostatic discharge..............................................................................................18
Installation sequence and checklist............................................................................................19
Installing the server into a rack or pedestal.................................................................................19
Remove the rails from the server......................................................................................19
Attaching the pedestal kit top and bottom........................................................................20
Attaching the bezel cover...............................................................................................22
Attaching the pedestal kit side pieces..............................................................................23
Attaching the pedestal feet.............................................................................................25
Booting and installing the operating system...........................................................................30
Operating system is loaded onto the server...........................................................................31
Operating system is not loaded onto the server......................................................................31
HP Confidential
Contents
3